You’re 48 hours from completion.
The money’s about to be sent. The keys are about to be yours.
But there’s one more thing worth doing: a pre-completion inspection.
It’s your last chance to spot problems before the property becomes yours.
What Is It?
It’s a final visit to the property, usually in the day or two before completion, to check that:
- the property is in the same condition as when you exchanged;
- all the fixtures and fittings included in the sale are still there;
- no new damage has happened;
- the seller is moving out on time.
When: one or two days before completion is ideal (more on timing below).
Who: you, usually with the estate agent. Your solicitor won’t attend.
How long: 30–60 minutes.
A pre-completion visit isn’t an automatic right. It needs the seller’s agreement, so ask the estate agent to arrange it as soon as you’ve exchanged.
The Pre-Completion Checklist
Condition
☐ No new cracks, damage or defects since your last visit
☐ No signs of flooding, leaks or water damage
☐ All doors and windows open, close and lock
☐ Heating working
☐ Hot water working
Fixtures and fittings
☐ Everything listed on the Fittings and Contents Form (TA10) as included is still there, for example:
- curtain rails and blinds;
- light fittings;
- kitchen appliances, if included;
- the garden shed, if included;
- built-in wardrobes;
- bathroom fittings;
- carpets, if included.
☐ None of these items is damaged
The seller moving out
☐ The property is clearly being packed up
☐ The seller (or agent) confirms they’ll be out by the completion time
☐ Nobody unexpected is living there
Outside
☐ The garden is in reasonable condition
☐ No rubbish dumped
☐ Gates and fences intact
☐ No abandoned vehicles
Red Flags
Serious issues: call your solicitor straight away
🚩 Major new damage (flood, fire, structural)
🚩 Items included in the sale have been removed
🚩 The seller isn’t moving out, or someone else is living there
Action: call your solicitor immediately and follow their advice. Don’t decide on your own to delay or refuse completion. You’re legally bound by the contract, and your solicitor will know what your options are under it.
Smaller issues: raise them, but don’t panic
⚠️ Minor damage (small marks, scratches)
⚠️ An overgrown or messy garden
⚠️ Some rubbish left behind
Action: take photos and tell your solicitor. Before completion, they can try to agree a solution with the seller’s solicitor, such as a retention (money held back from the seller until the problem is fixed). Agreeing this before completion is much easier than chasing it afterwards.
Taking Photos
Photograph:
- every room (a wide shot, plus close-ups of anything of note);
- any damage or issues;
- the items that should remain, such as fittings and appliances;
- the outside areas.
Email your solicitor:
“Pre-completion inspection done on [date]. The property is in the expected condition, all included items are present, and there are no issues. / I’ve found the following issues: [list], with photos attached.”
How It Can Go Wrong: Illustrative Examples
These are made-up examples of common situations, not real cases.
An appliance has gone. An integrated fridge-freezer listed as included has been taken. The buyer’s solicitor raises it with the seller’s solicitor before completion, and they agree the seller will return it or pay its value.
Lesson: check the fittings list item by item.
A new leak. There’s a damp patch on the bathroom ceiling that wasn’t there at the last viewing. The solicitors agree a retention to cover the repair.
Lesson: look up at the ceilings, as well as at the walls and floors.
Rubbish left in the garden. The garden is full of rubbish. The solicitors agree a small retention to cover clearance.
Lesson: check outside, including sheds and side passages.
The seller is still packing. The seller is still moving out on the morning of completion. Completion goes ahead later in the day.
Lesson: confirm the seller’s moving plans in advance through the estate agent.
Meter Readings
Take your meter readings on completion day itself, not at the inspection, because that’s when you become responsible for the bills.
Why they matter:
- the seller pays up to completion, and you pay from completion;
- clear readings prevent billing disputes.
What to record:
- Electricity: [number], with a timestamped photo
- Gas: [number], with a timestamped photo
- Water (if metered): [number], with a timestamped photo
Email to each supplier:
“I’m the new owner of [address] from [completion date]. Meter readings on [date]: [readings]. Please open an account in my name from that date.”
The Keys Check
Ask the agent to make sure you’ll receive keys for:
☐ the front door (main lock and any deadlock);
☐ the back door;
☐ the window locks;
☐ the garage and shed;
☐ any gates;
☐ the alarm code, if there is one.
Test each key when you collect them.
A Typical Completion Day
Morning: your solicitor confirms everything is ready and sends the money. Confirm the timing with your removal firm.
Usually late morning to early afternoon: the seller’s solicitor confirms they’ve received the money, completion happens and the keys are released.
Afternoon: collect the keys, do a quick walk-through of the empty property, take your meter readings, and let the removals in.
At handover, the property should be:
✓ empty of the seller’s belongings;
✓ clear of rubbish;
✓ in the same condition as at exchange;
✓ complete with all included items and all keys.
Don’t expect:
✗ professional cleaning (unless it was agreed);
✗ repairs to normal wear and tear;
✗ perfect condition.
After the Inspection: The Call to Your Solicitor
You: “I’ve done the pre-completion inspection. The property is fine. / There are some issues.”
If it’s fine: your solicitor confirms completion goes ahead as planned.
If there are issues: explain what you found and send your photos. Your solicitor contacts the seller’s solicitor and advises you on the options, such as a retention or compensation.
Getting the Timing Right
Too early (a week or more before):
- the seller is still living there normally;
- you can’t tell whether they’re ready to move out;
- things can change.
Too late (the morning of completion):
- if you find a problem, there’s very little time to sort it out;
- your removal van may arrive while it’s still being resolved.
Just right (24–48 hours before):
- the seller is clearly packing up;
- there’s time to resolve any issues before completion;
- it’s close enough that little is likely to change.
The Night-Before Checklist
☐ Pre-completion inspection done and photographed
☐ Any issues raised with your solicitor
☐ Removals confirmed for [time]
☐ Key collection arranged with the agent
☐ Utility suppliers told you’re moving in
☐ Buildings insurance in place (from exchange)
☐ Work knows you’re off tomorrow
☐ Phone charged (you’ll need it all day)
☐ Solicitor’s and agent’s numbers saved
The pre-completion inspection is your safety net. Use it.
If you were introduced to your estate agent through Cherished Blossoms Group, ask them to arrange the visit with the seller as soon as you’ve exchanged.
Need help with your checklist? Email